DeSoto Next Generation Solar Energy Center : ウィキペディア英語版 | DeSoto Next Generation Solar Energy Center
The DeSoto Next Generation Solar Energy Center is a photovoltaic solar power facility in Arcadia, DeSoto County, Florida owned by Florida Power & Light (FPL).〔(eXenewable Project Profile Page - DeSoto, PV, US )〕 President Barack Obama attended the plant's commissioning on October 27, 2009. It has a nameplate capacity of 25 megawatts (MW),〔 and produces an estimated 42,000 megawatt-hours (MW·h) of electricity per year (an average output of about 4.8 MW).〔 (【引用サイトリンク】 title= DeSoto Next Generation Solar Energy Center FAQs ) 〕〔 The plant cost $150 million to construct.〔 The plant consists of over 90,000 SunPower solar panels〔 〕 with single-axis trackers on .〔 〕 FPL has to get a permit for construction of the second stage and had filed for the permit to build the third stage of the plant. At the second stage, 49 MW of capacity will be added. At the third stage, 226 MW of capacity is planned to be added bringing the total capacity of the plant up to 300 MW.〔 ==See also==
* List of photovoltaic power stations * Renewable energy in the United States * Renewable portfolio standard * Solar power in the United States * Space Coast Next Generation Solar Energy Center
抄文引用元・出典: フリー百科事典『 ウィキペディア(Wikipedia)』 ■ウィキペディアで「DeSoto Next Generation Solar Energy Center」の詳細全文を読む
スポンサード リンク
翻訳と辞書 : 翻訳のためのインターネットリソース |
Copyright(C) kotoba.ne.jp 1997-2016. All Rights Reserved.
|
|